top of page

RF SHIELDING EFFECTIVENESS • ARCHITECTURAL ACOUSTIC TESTING

radio frequencies escaping a secured facility .jpg

Independent Testing.
Defensible Results.

AEGIS Field Testing provides independent RF shielding effectiveness and architectural acoustic field testing for government, defense, commercial, and specialized facilities. We deliver measured data, documented methodology, and defensible results.

IEEE 299 RF Shielding Effectiveness • ASTM E336 Airborne Sound Isolation

Field testing for facilities where RF shielding effectiveness and acoustic performance must be measured against defined requirements and documented for technical review.

Independent Measurement. Defined Requirements.

CORE FIELD TESTING CAPABILITIES

RADIO FREQUENCY

RF Shielding Effectiveness Testing

Airborne Sound Isolation Testing

nti.png

ARCHITECTURAL ACOUSTICS

Field measurement of electromagnetic shielding performance for rooms, enclosures, facility boundaries, doors, penetrations, and other points of entry.

RS.png

Field measurement of airborne sound isolation between rooms, partitions, doors, and building assemblies using precision acoustic instrumentation.

PRIMARY STANDARD

IEEE 299 - Shielding Effectiveness Measurement

PRIMARY STANDARD

ASTM E336 - Airbourne Sound Attenuation Between Rooms

SUPPORTING GOVERNMENT, DEFENSE, COMMERCIAL, AND PERFORMANCE-CRITICAL FACILITIES WITH INDEPENDENT FIELD VERIFICATION.

FIELD PROCESS

01

REQUIREMENT
REVIEW

Review the contract, specification, statement of work, facility conditions, and applicable test criteria.

From Requirement to Defensible Result

Every engagement begins with the governing technical requirement and ends with documented field measurements and clear technical reporting.

02

TEST
PLANNING

Define test locations, measurement configuration, frequencies, instrumentation, and site requirements.

THE GOVERNING CONTRACT, SPECIFICATION, OR STATEMENT OF WORK DEFINES THE ACCEPTANCE CRITERIA FOR EACH ENGAGEMENT.

03

FIELD EXECUTION

Conduct controlled field measurements while documenting equipment, locations, test conditions, and relevant observations.

04

DOCUMENTATION

Organize measurement data, field conditions, observations, and results for client and technical review.

INDEPENDENT FIELD TESTING

Our role is to measure and document facility performance as it exists. Testing is conducted independently of installation or remediation interests.

OUR ROLE

Measure accurately. Document completely. Report objectively.

AEGIS Field Testing was established as a specialized field-testing company focused on objective measurement and verification of facility performance.

Independent by Design. Built for the Field.

ABOUT AEGIS FIELD TESTING

FIELD-DRIVEN LEADERSHIP

AEGIS Field Testing was founded by a U.S. Army Special Operations veteran with more than two decades of military service, including approximately 15 years in U.S. Army Special Forces.

That background shaped the operating principles behind AEGIS: deliberate planning, disciplined field execution, accountability, and clear documentation.

START A PROJECT

Start a Technical Inquiry

Tell us what needs to be tested, where the facility is located, and the technical requirement or project objective you are working against. We’ll review the information and follow up to discuss the appropriate field-testing approach.

DIRECT CONTACT

 

North Carolina, USA

info@aegisfieldtesting.com

(910) 781-2812

Inquiry Type

DO NOT upload classified, CUI, export-controlled, or other sensitive information through this public website.

bottom of page